1 | - 50 Street
- 50 Avenue
- Emergency Services
- Ken Nichol Regional Recreational Centre (KNRRC)
- Beaumont Sport and Recreational Centre (BSRC)
| 24 hours after 5 cm snow accumulation or equivalent snow drift |
2 | - Inner Ring Road
- Outer Ring Road
- Surrounding Rural Roads
- Service Roads
- Collectors connecting Outer Ring Road to Exterior Roads
- School Zones
- City Hall Access
- Centre Communautaire Beaumont Community Centre (CCBCC) access
- Remaining Commercial Areas
| After Priority 1 is complete |
3 | - Residential through Roads
| After 15 cm snowpack measured from centre of road and after Priority 1 and Priority 2 complete |
4 | - Residential Non-Through Roads (Local Traffic Only)
- Cul-de-sacs
| After 20 cm snowpack measured from centre of road and after Priority 1 to Priority 3 complete |
5 | - Remaining Parking Lots
- Residential Alleys
| After a snowfall and after Priority 1 to Priority 4 complete |
Notes: - Snow plowing may occur on any street, road or lane at any time if the street becomes impassable for emergency response vehicles.
- Windrows of plowed snow in excess of 30 cm (12 inches) high shall normally be removed as part of the City's grader snow-clearing operation. As part of our mobilization, truck plows are dispatched to clear snow and they normally do not leave windrows greater than 30 cm (12 inches)high.
- Residents are responsible for removing windrows from their driveway entrances of 30 cm (12 inches) or less.
- Snowfall is measured at the Beaumont Operations Facility.
- Snowpack is measured from the center of residential roads.
|